Skip to Content

Welcome to the Scallix Knowledge Center


This Knowledge Center provides step-by-step guidance for operators, facility managers, and technicians deploying Scallix smart coolers powered by Shekel technology across offices, gyms, hospitals, factories, and commercial sites throughout North America.

From site preparation and connectivity testing to smart shelf assembly, planogram configuration, and troubleshooting, everything needed for reliable operation and long-term performance is available in one place.

<img src="path/to/Smart-Cooler-Scale-Based.jpg" alt="AI-powered smart cooler with scale-based technology in a modern retail environment">

Scallix Dashboard Video Tutorials

Access Scallix dashboard video tutorials covering inventory monitoring, planogram creation and updates, technician mode, troubleshooting, and daily smart cooler management through the smart vending platform.

Watch Videos

Subscribe to our YouTube channel
Scallix-user-manual-cooling-system

Cooling System User Manual

This manual explains how the Lynx Smart Cooler cooling system operates, including temperature control, cooling performance, and best practices for maintaining efficient and reliable smart cooler operation in commercial environments.

Powered by Imbera.

Download the User Manual

Lynx Smart Cooler specifications

This document provides detailed smart cooler specifications and installation requirements, including physical dimensions, power requirements, operating conditions, and site preparation guidelines for commercial smart cooler deployments.

Supports proper installation, logistics planning, and long-term operation.

Download Specifications 

Scallix-user-manual-first-steps

Smart System User Manual

This manual covers the complete smart vending system setup and operation, including smart cooler installation, stocking guidelines, planogram setup, product recognition best practices, and daily smart vending operations.

Powered by Shekel LTD.

Download the User Manual

Network requirements

Lynx Cooler Network Requirements

This document outlines the smart cooler network requirements necessary for stable operation, including LTE and Wi-Fi connectivity, network testing procedures, and configuration guidelines to support monitoring, reporting, and remote smart cooler support.

Powered by Shekel LTD.

Download Network Requirements

Site logistic plan

Site Logistic Plan

This guide defines the logistics and site preparation requirements required for successful smart cooler delivery and installation. It covers access planning, dimensional clearance, delivery conditions, and pre-installation readiness for commercial locations.

Designed for smart cooler deployments across offices, gyms, hospitals, factories, and other North American sites. 

Download logistic plan

How to assemble the smart shelves

Smart Shelves Assembling

This guide provides step-by-step instructions for smart shelf assembly, including shelf spacing, divider placement, cable positioning, and setup best practices to ensure accurate product recognition and reliable smart vending performance. 

Download step-by-step instructions